Send Message
Home > products > Mineral Processing Plant >
2000t/D Complete Mineral Processing Plant Ore Pelletizing

2000t/D Complete Mineral Processing Plant Ore Pelletizing

2000T/D Complete Mineral Processing Plant

Lead Recovery Ore Pelletizing Plant

Ore Beneficiation Mineral Processing Plant

Place of Origin:

China

Brand Name:

Hengyang

Certification:

ISO9001

Model Number:

F-0015

Contact Us
Request A Quote
Product Details
Capacity:
2000-10000T/D
Color:
According To Buyers Requirement'
Order:
Made To Order
Appplication:
Mineral Ore
Condition:
New
Payment & Shipping Terms
Minimum Order Quantity
1 Set
Packaging Details
negociated
Delivery Time
35 days
Payment Terms
T/T
Supply Ability
350sets/month
Product Description

Complete Mineral Industrial Production Line Lead Recovery Production Line

 

Brief introduction about mineral ore beneficiation line:
The ore processing equipment composes of many equipments, such as jaw crusher, impact crusher, vibrating feeder, belt converyor, ball mill, spiral separator, mixer, rotary kiln,and so on. as to how many equipments needed for each model, it's mainly depended on your situation and your expect about the final product, such as the size of the stone, the grade of the coarse ore and your expect on the final product,etc.

 

Complete Mineral Industrial Production Line Lead Recovery Production Line

Our Advantages:

1. High efficiency
In crushing, it adopts traditional two-stage and a closed circuit system for ideal fineness. Besides, jaw crushers have large crushing capacity.
2. Saving energy
In grinding and classification, with characteristics of large processing capacity and small floor area, superfine lamination autogenous mill can save energy by more than 85%.
3. Good classifying effects
In classification, hydrocyclone and vibrating screen can enhance the classifying effects.
4. Environmental protection
It adopts the third generation tailings dry stacking technology, which can save energy by 60-80%. Furthermore, it can also protect the environment and build a base for green mine.


Process introduction:

After beneficiation, there are some residual water in ore concentration. So we have to carry on concentrate dehydration to meet the requirements of transportation and smelting.

2000t/D Complete Mineral Processing Plant Ore Pelletizing 0

500 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5  
Jaw crusher PE400×600 1 30 Cast steel rack
Jaw crusher PEX250×1000 2 37 Cast steel rack
Swaying feeder 600×600 1 2.2  
Rotary ball mill Dia2.1×4.0 1 245  
Spiral classifier FLG-2000 1 18.5  
Magnetic separator CTB900×1800 1 4 2500gs
Magnetic separator CTB750×1800 2 3 1400~180gs

 

1000 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5  
Jaw crusher PE600×900 1 75 Cast steel rack
Fine jaw crusher PEX250×1200 2 37 Cast steel rack
Vibrating feeder DZ-5 2 0.75×2/set  
Ball mill Dia2.7×3.6 1 475  
Spiral classifier FLG-3000 1 30  
Magnetic separator CTB-1024 1 5.5 2500gs
Magnetic separator CTB-1021 2 4/set 1400~1800gs

Send your inquiry directly to us

Privacy Policy China Good Quality Waste Processing Plant Supplier. Copyright © 2021-2025 wasteprocessingplant.com . All Rights Reserved.